Alternatives for Starting Manual Surge Testing
1. Press LEAD button to select lead to test.
2. Press and hold PTT button (top left of ADX front panel—1 below) to activate Surge test then turn the Voltage
Output Ramp switch (top right of the ADX front panel—2 below) clockwise to increase the voltage to the target
level.
NOTE: If you have a footswitch connected to the ADX, it provides an alternative to using the PTT button
to start and stop the test.
3. Run test for the desired number of pulses then release PTT / footswitch to stop test for the selected lead.
Fig 88:
ADX front panel controls for starting Surge test.
www.megger.com
Megger Baker ADX User Guide
92
Manual Tests
Summary of Contents for ADX15
Page 1: ...Megger Baker ADX Automated Diagnostic Test Equipment User Guide...
Page 2: ...www megger com Megger Baker ADX User Guide...
Page 10: ...www megger com Megger Baker ADX User Guide viii Table of Contents...
Page 44: ...www megger com Megger Baker ADX User Guide 34...
Page 84: ...www megger com Megger Baker ADX User Guide 74 Routes...
Page 148: ...www megger com Megger Baker ADX User Guide 138...
Page 172: ...www megger com Megger Baker ADX User Guide 162...