2. If you choose to run capacitance testing, the software will alert you to reconfigure the test leads as shown in the
example below. Test Lead 1 will be connected to motor lead 1, test lead 2 to the motor frame, and test lead three
will be disconnected (not contacting any motor lead or ground).
NOTE: Acknowledge this message only after the leads have been reconfigured. Pressing the OK button
will immediately initiate the capacitance test.
Fig 80:
Manual Test; lead reconfiguring message for capacitance testing.
3. Another message will appear after the capacitance test completes telling you to return the test leads to their original
configuration.
Ensure that the connections are restored before clicking OK
.
4. The RLC test registers the measurements taken on each test lead and compares them to the target values specified
in the test configuration. If the measure values are within specified limits, the test will pass. The test also checks for
imbalance between the phases and displays results in the main RLC Test tab.
5. When the RLC testing completes, you will see measurement results displayed in the RLC Test tab as shown in the
example below. Failing tests will appear in red. Examine the results to start your assessment of the problem for
failed tests.
Fig 81:
Manual Test—RLC main test results tab.
www.megger.com
Megger Baker ADX User Guide
85
Manual Tests
Summary of Contents for ADX15
Page 1: ...Megger Baker ADX Automated Diagnostic Test Equipment User Guide...
Page 2: ...www megger com Megger Baker ADX User Guide...
Page 10: ...www megger com Megger Baker ADX User Guide viii Table of Contents...
Page 44: ...www megger com Megger Baker ADX User Guide 34...
Page 84: ...www megger com Megger Baker ADX User Guide 74 Routes...
Page 148: ...www megger com Megger Baker ADX User Guide 138...
Page 172: ...www megger com Megger Baker ADX User Guide 162...