Preventive Maintenance
9G9002 – 2011-08-15
3-1
Section 3: Preventive Maintenance
Necessary Materials
The materials necessary for performing Preventive Maintenance (PM) are:
• Tools
• PM materials
Required Tools
• Laptop computer with MICROSOFT WINDOWS 98 operating system or higher and MICROSOFT INTERNET
EXPLORER
• Service tool
• Crossover cable
• Temperature meter with probe
• Block for probe, kit
• Vacuum cleaner
• Flashlight
• Scraper – recommended blade size is 1.25 × 4.75 in.
• T20 Torx driver
• T10 Torx driver
PM Materials
PM Intervals
Important
A Preventive Maintenance (PM) call must be made every 20,000 film cycles. To consistently produce high quality
images, the imager must receive periodic routine maintenance. Perform PM procedures:
• Every Emergency Maintenance Call (EM)
• Every 20,000 cycles the display screen displays a message prompting the user to schedule preventive
maintenance. The procedures listed in the 20,000 cycle checklist should be performed as soon as possible after
the 20,000 cycle PM prompt.
Part No.
Description
Notes
—
3M Auto-Pak tack cloth
—
Alcohol wipes
Texwipe TX1065, 50 each
—
Cleaning pads, 10 × 10 cm (4 × 4 in.)
100 each
—
Bag with tie-wraps
Use one bag for each PM.
A4A99G7543
Deodorant filter
Take 3 to the PM site
A4A99G5904
Felt pad assembly
Replace every PM (20,000 cycles)
—
Safety glasses with side shields