Chapter 7
129
Post-Repair Procedures
Post-Repair Procedures
7. Po
st-
R
e
p
air Pr
ocedu
re
s
LCD Assembly
No adjustment needed
Inspect the booting process, and power on
test result.
Key Assembly
No adjustment needed
Inspect the booting process, and power on
test result.
“To Check the Front Panel” on page 56
Interface Board
No adjustment needed
Inspect the booting process, and power on
test result.
“To Check the Handler Interface Function”
on page 60
“To Check the Scanner Interface Function”
on page 64
Table 7-1
Post-Repair Procedures
Replaced
Assembly or Part
Required Adjustments
Correction Constants (CC)
Verification
Summary of Contents for E4981A
Page 1: ...Keysight E4981A 120 Hz 1 kHz 1 MHz Capacitance Meter Service Guide ...
Page 2: ......
Page 13: ...Contents 11 L 145 M 145 N 145 O 146 P 146 Q 146 R 147 S 147 T 147 U 148 Warning Message 149 ...
Page 14: ...12 Contents ...
Page 70: ...68 Chapter4 Troubleshooting Performance test failure troubleshooting ...
Page 84: ...82 Chapter5 Replaceable Parts Replaceable Parts List Front Panel Figure 5 12 Front Panel ...
Page 132: ...130 Chapter7 Post Repair Procedures Post Repair Procedures ...
Page 138: ...136 AppendixB Firmware Update Update the E4981A firmware using USB cable ...
Page 142: ...140 AppendixC Power Requirement Power Requirements ...