18
Chapter 2
Performance Test
Introduction
Introduction
This chapter provides the performance tests outline for Keysight E4981A. The
performance test names are listed in
Table 2-1
. The test descriptions are described
sequentially in the following pages.
NOTE
Allow the analyzer to warm up for at least 30 minutes before you execute any of the
performance tests.
Perform all performance tests in an ambient temperature of 23
±
5
⋅
C
NOTE
The performance tests should be performed periodically. The recommended test interval is
12 months.
The test interval depends on maintenance and the environmental conditions under which
the instrument is used. You may find that the interval could be shortened or lengthened;
however, such a decision should be based on substantial quantitative data.
Test Equipment Required
The required equipment for the performance test is listed in
. Use only calibrated
equipment when doing the performance test.
Table 2-1
List of the
E4981A
performance tests
Para.
Title
1
Test Signal Frequency Accuracy Test
2
Test Signal Level Accuracy Test
3
Impedance Measurement Accuracy Test
Summary of Contents for E4981A
Page 1: ...Keysight E4981A 120 Hz 1 kHz 1 MHz Capacitance Meter Service Guide ...
Page 2: ......
Page 13: ...Contents 11 L 145 M 145 N 145 O 146 P 146 Q 146 R 147 S 147 T 147 U 148 Warning Message 149 ...
Page 14: ...12 Contents ...
Page 70: ...68 Chapter4 Troubleshooting Performance test failure troubleshooting ...
Page 84: ...82 Chapter5 Replaceable Parts Replaceable Parts List Front Panel Figure 5 12 Front Panel ...
Page 132: ...130 Chapter7 Post Repair Procedures Post Repair Procedures ...
Page 138: ...136 AppendixB Firmware Update Update the E4981A firmware using USB cable ...
Page 142: ...140 AppendixC Power Requirement Power Requirements ...