Summary of Contents for G130

Page 1: ...L G Confidential G130 Installation and Commissioning Manual July 2012 ver 01 2012 Landis Gyr Ltd Advanced Metering Infrastructure L G Electronic Smart Ready Gasmeter G130 Installation Manual...

Page 2: ...Revision history Issue Date Comments 1 July 2012 First revision of G130 Installation and Commissioning Manual Subject to change without notice Landis Gyr 1 Lysander Drive Northfields Industrial Estat...

Page 3: ...________________________5 3 Installation Procedure ___________________________________________________ 6 4 The Service Menu_______________________________________________________ 8 4 1 The Service Men...

Page 4: ...applies to the G130 Smart Ready Gas meter E6 residential gas meter 1 2 Purpose This manual contains information required to install and commission the G130 Smart meter 1 3 Target Group The contents o...

Page 5: ...s user manual are sufficiently qualified strictly observe the safety regulations and the operating information in the individual chapters In particular the owner of the meter bears responsibility for...

Page 6: ...requires no maintenance by the end user The external surfaces may be cleaned if required using a damp or anti static cloth 3 2 The safe removal of the existing meter 1 Isolate the gas supply via the...

Page 7: ...ld be followed G130 Valve Status displays 3 5 Display cycle The full display cycle is shown in the diagram below Press A or B to wake the display The index display is then shown Pressing button A will...

Page 8: ...haracters are entered pressing button A until the desired character is shown in that position Pressing button B will move to the next character on the right It is possible to roll around back to the b...

Page 9: ...Issue 1 9 10 G130 Installation and Commissioning July 2012 ver 01 2012 Landis Gyr Ltd 5 Rolling Register Displays The G130 has a single rolling register which displays the module firmware version...

Page 10: ...ble to initiate a valve open process as follows Press button B Release button B Confirm Appliances are off by pressing button A Hold button A until display changes to next Release button A Wait for va...