background image

 

 

Issue:1 

4/10 

G130 Installation and Commissioning  

                      July 2012 ver 01 

© 2012 Gyr Ltd 

 

Introduction 

This specification describes the procedure to install a  Gyr E6V meter with G130 
module fitted. 

1.1 

Scope 

This guide applies to the G130 Smart Ready Gas meter, E6 residential gas meter.  

1.2 

Purpose 

This manual contains information required to install and commission the G130 Smart 
meter. 

1.3 

Target Group 

The contents of this user manual are intended for technically qualified personnel of 
energy supply companies responsible for system planning, installation and 
commissioning, operation, maintenance, decommissioning and disposal of the meter. 

 

Summary of Contents for G130

Page 1: ...L G Confidential G130 Installation and Commissioning Manual July 2012 ver 01 2012 Landis Gyr Ltd Advanced Metering Infrastructure L G Electronic Smart Ready Gasmeter G130 Installation Manual...

Page 2: ...Revision history Issue Date Comments 1 July 2012 First revision of G130 Installation and Commissioning Manual Subject to change without notice Landis Gyr 1 Lysander Drive Northfields Industrial Estat...

Page 3: ...________________________5 3 Installation Procedure ___________________________________________________ 6 4 The Service Menu_______________________________________________________ 8 4 1 The Service Men...

Page 4: ...applies to the G130 Smart Ready Gas meter E6 residential gas meter 1 2 Purpose This manual contains information required to install and commission the G130 Smart meter 1 3 Target Group The contents o...

Page 5: ...s user manual are sufficiently qualified strictly observe the safety regulations and the operating information in the individual chapters In particular the owner of the meter bears responsibility for...

Page 6: ...requires no maintenance by the end user The external surfaces may be cleaned if required using a damp or anti static cloth 3 2 The safe removal of the existing meter 1 Isolate the gas supply via the...

Page 7: ...ld be followed G130 Valve Status displays 3 5 Display cycle The full display cycle is shown in the diagram below Press A or B to wake the display The index display is then shown Pressing button A will...

Page 8: ...haracters are entered pressing button A until the desired character is shown in that position Pressing button B will move to the next character on the right It is possible to roll around back to the b...

Page 9: ...Issue 1 9 10 G130 Installation and Commissioning July 2012 ver 01 2012 Landis Gyr Ltd 5 Rolling Register Displays The G130 has a single rolling register which displays the module firmware version...

Page 10: ...ble to initiate a valve open process as follows Press button B Release button B Confirm Appliances are off by pressing button A Hold button A until display changes to next Release button A Wait for va...