If the valve is open the screen will display ON.   

If the valve is closed the screen will display OFF and the option to open the valve will be 
shown (Press B for Gas).  To open the valve the instructions in section 6 should be 
followed.  

 

G130 Valve Status displays   

3.5 

Display cycle 

The full display cycle is shown in the diagram below.   
 
Press A or B to wake the display.   
 
The index display is then shown.   
 
Pressing button A will then show the valve status display.   
 
Another press of button A or a timeout will return to the default display.   
 
Holding button A whilst in the default display will enter the Rolling Register display 
sequence.    
 
The number of rolling registers shown and their sequence is defined at the time of 
manufacture. 

 

Summary of Contents for G130

Page 1: ...L G Confidential G130 Installation and Commissioning Manual July 2012 ver 01 2012 Landis Gyr Ltd Advanced Metering Infrastructure L G Electronic Smart Ready Gasmeter G130 Installation Manual...

Page 2: ...Revision history Issue Date Comments 1 July 2012 First revision of G130 Installation and Commissioning Manual Subject to change without notice Landis Gyr 1 Lysander Drive Northfields Industrial Estat...

Page 3: ...________________________5 3 Installation Procedure ___________________________________________________ 6 4 The Service Menu_______________________________________________________ 8 4 1 The Service Men...

Page 4: ...applies to the G130 Smart Ready Gas meter E6 residential gas meter 1 2 Purpose This manual contains information required to install and commission the G130 Smart meter 1 3 Target Group The contents o...

Page 5: ...s user manual are sufficiently qualified strictly observe the safety regulations and the operating information in the individual chapters In particular the owner of the meter bears responsibility for...

Page 6: ...requires no maintenance by the end user The external surfaces may be cleaned if required using a damp or anti static cloth 3 2 The safe removal of the existing meter 1 Isolate the gas supply via the...

Page 7: ...ld be followed G130 Valve Status displays 3 5 Display cycle The full display cycle is shown in the diagram below Press A or B to wake the display The index display is then shown Pressing button A will...

Page 8: ...haracters are entered pressing button A until the desired character is shown in that position Pressing button B will move to the next character on the right It is possible to roll around back to the b...

Page 9: ...Issue 1 9 10 G130 Installation and Commissioning July 2012 ver 01 2012 Landis Gyr Ltd 5 Rolling Register Displays The G130 has a single rolling register which displays the module firmware version...

Page 10: ...ble to initiate a valve open process as follows Press button B Release button B Confirm Appliances are off by pressing button A Hold button A until display changes to next Release button A Wait for va...

Reviews: