3. Operation
220
The timing chart shown below indicates that the actuator changes its speed while it moves to
position No.1 after the completion of positioning at position No.2 and moves to position No.0.
Start signal
ST0
(PLC
→
Controller)
Position sensing Output
LS0
(Controller
→
PLC)
Start signal
ST1
(PLC
→
Controller)
Position sensing Output
LS1
(Controller
→
PLC)
Position sensing Output
LS2
(Controller
→
PLC)
Target position of
position No.0 and
No.1
Start signal
ST2
(PLC
→
Controller)
Set of positioning
width of position
No.1 to shift change
start position
Operation of actuator
Stop at position
No.2
Moving at speed of
Position No.1
Moving at speed of
position No.0
Completion of
positioning at
position No.0
ST0 signal input
becomes effective
3.2.6
Summary of Contents for SCON-CB-F
Page 2: ......
Page 4: ......
Page 10: ......
Page 16: ......
Page 48: ...1 Specifications Check 32 1 3 3 SCON CGB 3000W and above ...
Page 60: ...1 Specifications Check 44 ...
Page 266: ...3 Operation 250 ...
Page 276: ...4 Field Network 260 ...
Page 282: ...5 Vibration Suppress Control Function 266 ...
Page 362: ...9 Troubleshooting 346 ...
Page 444: ...10 Appendix 428 ...
Page 449: ......