
Preventive Maintenance Schedules
Maintaining a scanner logbook
p/n 6510020208
10/18/07
8-5
Procedure Daily
Weekly
Months
Years
Procedure
Details
1 6 1 3 5
LIQUID COOLING
SYSTEMS
Open loop cooling system
maintenance
Closed loop cooling system
maintenance
X
XX
Chiller maintenance
XX XX
∗
PMP ENCLOSURE
COOLING
Leaking coolant in heat
exchanger drain
Air flow from heat
exchanger fans
Solenoid valve on heat
exchanger replacement
RADIATION
SAFETY
Required radiation safety
tests on all nuclear and X-
ray sensors
X
Radiation
Safety
Manual
6510020199
Radiation lamps
replacement (3 mos)
8.2. Maintaining a scanner logbook
A scanner/sensor maintenance logbook must be made for each scanner.
The daily, weekly, monthly, yearly, checklist should be signed off each
time it is performed (including inspection date, who inspected, what was
done, and other pertinent information). Also, enter any changes to the
scanner in the logbook. This includes any items that have been replaced,
air pressure and flow changes, coolant flow changes, scanner damage,
∗
To prolong the anti-rust, corrosion, scale, and heat transfer properties of the coolant mixture an additive
6530220027 EXTENDER, COOLANT HD ANTIFREEZE is required after three years of operation. The additive
is to be added in a ratio of 45:1 with the capacity of the cooling system.
Summary of Contents for 4022
Page 1: ...Precision Platform 4022 Scanner System Manual 6510020208 ...
Page 2: ......
Page 3: ...Precision Platform 4022 Scanner October 2007 ...
Page 22: ......
Page 72: ......
Page 94: ......
Page 126: ......
Page 162: ......
Page 170: ......
Page 234: ......
Page 239: ...Glossary p n 6510020208 10 18 07 11 5 VIO Virtual Input Output ...