ELECTRIC STARTING SYSTEM
CBX250
Voltage breaker magnetic start
Plug the connector 4P breaker magnetic start.
Place the transmission in neutral.
.
Measure the voltage between the terminal of the cable
yellow/red (+), in the connector 4P breaker magnetic to start,
and the earth ( ).
The voltage of the battery must indicate only when the
switch is pressed to start, with the power switch activated
(ON position).
Apart from the protectors of rubber; then, of accommoda-
tion remove the nuts and cables.
Remove the magnetic switch start of the box of the battery.
Install components in reverse order dismantling.
CLUTCH DIODE
DISMANTLING
Remove the saddle (page 2-2).
Open the door of the fuse box and remove the diode clutch.
DISMANTLING/Installation
Remove the cover right side (page 2-2).
Release the connector 4P breaker magnetic start.
CONNECTOR 4P
NUTS/CABLES
DIODE
CONNECTOR 4P
Summary of Contents for 2010 CBF 250
Page 1: ...WORKSHOP MANUAL...
Page 33: ...Chassis FAIRING EXHAUST SYSTEM 2 6 CBX250 NOTES...
Page 58: ...MAINTENANCE CBX250 NOTES...
Page 60: ...4 0 LUBRICATION SYSTEM CBX250 DIAGRAM OF LUBRICATION SYSTEM...
Page 70: ...5 0 FUEL SYSTEM CBX250...
Page 92: ...DISMANTLING AND INSTALLING THE ENGINE CBX250 NOTES...
Page 118: ...8 0 PISTON CYLINDER CBX250...
Page 126: ...PISTON CYLINDER CBX250 NOTES...
Page 128: ...9 0 CLUTCH GEAR SELECTOR CBX250 108 N m 10 8 kg m 12 N m 1 2 kg m 108 N m 10 8 kg m...
Page 142: ...10 0 ALTERNATOR CBX250 103 N m 10 3 kg m...
Page 152: ...11 0 TRANSMISSION CBX250...
Page 166: ...12 0 CRANKSHAFT FLYWHEEL CBX250...
Page 200: ...FRONT WHEEL SUSPENSION STEERING CBX250 NOTES...
Page 222: ...REAR WHEEL BRAKE SUSPENSION CBX250 NOTES...
Page 246: ...BATTERY CHARGING SYSTEM CBX250 NOTES...
Page 256: ...IGNITION SYSTEM CBX250 NOTES...
Page 270: ...ELECTRIC STARTING SYSTEM CBX250 NOTES...