4
|
Components
Service manual
196
EBLA04~08E + EDLA04~08E
Daikin Altherma 3 M
ESIE22-09 – 2022.05
a
Screw
b
Main PCB
4
Install the ground wiring on the correct location on the switch box and fix
using the screw.
a
b
c
d f
e
f
a
Compressor wiring
b
Power supply wires from X1M
c
Wire from X2M
d
Fixation plug (ferrite core)
e
Screw (ground wiring)
f
Screw (terminal plate)
5
Correctly fit the terminal plate on the main PCB mounting plate. Install and
tighten the 2 screws to fix the terminal plate.
6
Connect the power supply wiring to the main power supply terminal X1M.
7
Connect the red wire to the terminal X2M.
8
Fix the ferrite core(s) (for power supply wiring) to the switch box (fixation
plug).
9
Connect all other connectors to the main PCB.
INFORMATION
Use the wiring diagram and connection diagram for correct installation of the
connectors, see
281].
10
Connect the connector of the compressor wiring.
11
Install new tie straps to fix the compressor wiring harness to the switch box.
12
Install and tighten the 3 screws to fix the switch box to the unit.
INFORMATION
The 2 screws at the hydro box side are reachable using a small ratchet ¼ inch and
socket nr. 8 or wrench ¼ inch with a cardan joint.
draft – 31/05/2022 15:53