4
|
Components
Service manual
184
EBLA04~08E + EDLA04~08E
Daikin Altherma 3 M
ESIE22-09 – 2022.05
2
To install the LAN adapter PCB, see
To install the LAN adapter PCB
1
See installer reference guide of the LAN adapter PCB for correct procedure.
INFORMATION
Before installing the PCB, copy the DIP switch settings from the original PCB to the
spare PCB.
Is the problem solved?
Action
Yes
No further actions required.
No
PCB and continue with the next
procedure.
4.14 Main PCB
4.14.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
202].
1
Turn ON the power of the unit.
2
Measure the voltage between the black and white wires.
Result:
The measured voltage MUST be 230 V AC.
b
a
a
HL1
b
HN1