![background image](http://html1.mh-extra.com/html/daikin/ebla04e-v-series/ebla04e-v-series_service-manual_4704429195.webp)
4
|
Components
Service manual
195
EBLA04~08E + EDLA04~08E
Daikin Altherma 3 M
ESIE22-09 – 2022.05
13
To install the main PCB
1
Apply thermal grease G‑746 compound (part number 5037158) to the PCB
contact surface of the heat sink. Distribute the grease as evenly as possible.
CAUTION
ALWAYS apply new grease on the PCB heat sink. NOT doing so may cause the PCB to
fail due to insufficient cooling.
a
a
a
a
a
a
a
a
Heat sink contact surface
2
Install the main PCB in the correct location on the switch box.
3
Install and tighten the screws to fix the main PCB.
a
a
a
a
a
a
a
a
a
a
a
a
b
draft – 31/05/2022 15:53
Summary of Contents for EBLA04E V Series
Page 322: ...14 14...
Page 323: ......