111
Figure 26: Unlocking the microprocessor socket
b. Gently lift the socket lever to open the metal frame.
Figure 27: Opening the metal plate
2. Using your thumb and index finger, carefully grasp the microprocessor by its
north and south center edges and lift it up and out of the server.
Figure 28: Removing the microprocessor
3. Store the microprocessor in an antistatic package for possible future use.
Metal frame
Socket lever
South center edge
North center edge
Summary of Contents for Color Controller C-80
Page 2: ......
Page 8: ...vi Color Controller C 80 1 0 Technical Manual...
Page 17: ...1 Product Overview Introduction 2 Product Configuration 4...
Page 22: ...6 Chapter 1 Product Overview...
Page 52: ...36 Chapter 2 First Time Setup and Configuration...
Page 103: ...87 5 Click Yes 6 Click OK 7 To enable the changes to take effect restart your computer...
Page 104: ...88 Chapter 4 Diagnostics and Troubleshooting...
Page 142: ...126 Chapter 5 Hardware and Maintenance Repairs...
Page 149: ......
Page 150: ......