5
C) Three image disks:
•
250 GB each
•
After processing (RIPing), rasterized jobs are sent to (and stored on) the
image disks as RTP jobs
•
Jobs stored on the image disks are changed or deleted via the Color
Controller C-80 software
D) Gigabit ethernet connection:
•
Enables high-speed connection to the network
1.1.5 Disk Configuration
The following table outlines the Color Controller C-80 disk configuration.
Disk 0
C:
Windows XP Professional
Color Controller C-80 software
D:
Spool files
Shared files
Output directory files
Automatic Picture
Replacement (APR)
high-resolution files
Backup folder
Disk 1
Image storage
Disk 2
Image storage
Disk 3
Image storage
Summary of Contents for Color Controller C-80
Page 2: ......
Page 8: ...vi Color Controller C 80 1 0 Technical Manual...
Page 17: ...1 Product Overview Introduction 2 Product Configuration 4...
Page 22: ...6 Chapter 1 Product Overview...
Page 52: ...36 Chapter 2 First Time Setup and Configuration...
Page 103: ...87 5 Click Yes 6 Click OK 7 To enable the changes to take effect restart your computer...
Page 104: ...88 Chapter 4 Diagnostics and Troubleshooting...
Page 142: ...126 Chapter 5 Hardware and Maintenance Repairs...
Page 149: ......
Page 150: ......