![CORNING Ascent 6970 Instruction Manual Download Page 107](http://html1.mh-extra.com/html/corning/ascent-6970/ascent-6970_instruction-manual_2668650107.webp)
103
Instruction Manual
• Pull out both tabs to remove the membranes.
• Twist the insert and body to lock the connection.
• Continue setting up the Harvest Kit tubing lines.
• This figure shows a close-up of the AseptiQuik® DC connector insert which mates with the
body.
9.
On the HMI, select Harvest Phases.
Select Harvest Prep.
10.
Press
to run Harvest Preparation Phase.
All equipment module controls are automatically stopped; MCV heater, FBR heater, and pumps
are turned off.
11. Fluidically isolate the bioreactor.
• Clamp the bioreactor inlet and return tubing
lines to the MCV.