![CORNING Ascent 6970 Instruction Manual Download Page 105](http://html1.mh-extra.com/html/corning/ascent-6970/ascent-6970_instruction-manual_2668650105.webp)
101
Instruction Manual
4. Blue pinch valve tubing load.
• Locate the 3-way tubing line with blue clips.
• At one end is the AseptiQuik® connection
to the bioreactor outlet.
• At the other end are 2 tubing lines that
connect to the Flush and Waste bottles.
• Install the white/blue tubing line in the blue pinch valve.
The white tubing line connects to the Flush bottle.
• Install the black/blue tubing line in the blue pinch valve.
The black tubing line connects to the Waste bottle.
5. Green pinch valve tubing load.
• Locate the 3-way tubing line with green clips.
• At one end is the AseptiQuik® connection to the
bioreactor inlet.
• At the other end are 2 tubing lines that connect to
the Harvest collection and Harvest Solution.
• Install the green/white tubing line into the green
pinch valve.
• Aseptically connect the Harvest collection to the
green/white tubing line (see AseptiQuik® DC
connection Step 8).
• Install the green/black tubing line in the green
pinch valve.
• The green/black tubing line connects to the
Harvest Solution.