32-7
Cisco BPX 8600 Series Installation and Configuration
Release 9.3.30, Part Number 78-12907-01 Rev. E0, May 2005
Chapter 32 AT3-6ME (T3 to T2) Interface Adapter
Installation
BPX or IGX Port Configuration
To configure the trunk on the BPX or IGX node by using Cisco WAN Manager network management
workstation or a local control terminal, use the following procedure:
Step 1
Telnet to the first node equipped with an AT3-6ME.
Step 2
Use the Configure Trunk (
cnftrk
) command to select T2 for the Tx Trunk Rate.
Step 3
Set the RCV Trunk Rate to 28980 cps.
Step 4
Repeat steps 1 through 3 for all other nodes using the AT3-6ME.
Table 32-4 DIP Switch SW-2 Selection Guide
Switches
Position
Function
1
2
Up
Up
Internal synchronization source for the T2 transmitter
1
2
Up
Down
Slave T2 transmitter to T3 line
1
2
Down
Down
Slave T2 transmitter to T2 receiver
3
4
Up
Up
Long length T3 cable
3
4
Up
Down
Medium length T3 cable
3
4
Down
Down
Short length T3 cable; system is co located to IGX or BPX
1
(default)
1.
T2 and T3 cable length should be set to “short” upon power-up for self-test.
Upon LOS, defaults to “internal synchronization.”
5, 6
don’t care
Unused
7
Up
ATM converter mode
7
Down
Test Mode
8
Up
Enable BPV relay from T2 to T3
8
Down
Disable PV relay from T2 to T3
9
Up
Long length T2 cable
9
Down
Short length T2 cable (default)
1
10, 11, 12
Don’t care
Unused
Summary of Contents for BPX 8650
Page 49: ...P A R T 1 The BPX Switch ...
Page 50: ......
Page 159: ...P A R T 2 Installation ...
Page 160: ......
Page 273: ...P A R T 3 Initial Configuration and Network Management ...
Page 274: ......
Page 311: ...P A R T 4 Configuring Connections ...
Page 312: ......
Page 487: ...P A R T 5 Troubleshooting and Maintenance ...
Page 488: ......
Page 533: ...P A R T 6 BPX Specifications ...
Page 534: ......
Page 555: ...P A R T 7 Appendices ...
Page 556: ......