C H A P T E R
16-1
Cisco BPX 8600 Series Installation and Configuration
Release 9.3.30, Part Number 78-12907-01 Rev. E0, May 2005
16
Checking and Powering-Up
This chapter explains how to check that you are ready and then perform the initial power-up.
Before proceeding to this chapter, you should first complete the procedures in:
•
Chapter 15, “Connecting Temporary Terminal and Attaching Peripherals”
•
Chapter 14, “Connecting Cables”
•
Chapter 13, “Installing the BPX Switch Cards”
and before that, the procedures in either:
•
Chapter 10, “Installing the DC Shelf”
•
Chapter 11, “Installing the AC Shelf”
and
•
Chapter 12, “Installing the T3/E3 Cable Management Tray”
and before that, the procedures in either:
•
Chapter 8, “Installation with Cisco Cabinets including 7000 Series Routers”
or
•
Chapter 9, “Installation in Customer Cabinet”
Before operating the BPX switch, verify that the following procedures have been performed:
Step 1
The BPX switch is connected to an appropriate power source with an isolated ground connection,
according to the procedures in Chapter 10, “Installing the DC Shelf” or Chapter 11, “Installing the AC
Shelf,” as applicable.
Step 2
The BPX switch power cord is plugged into an appropriate power outlet.
Step 3
The full complement of cards for the specific node are mounted in the correct slots, correctly seated, and
locked in place
.
Step 4
The T3 or E3 connections are attached appropriately.
Step 5
A control terminal (or Cisco WAN Manager Work Station) is connected to the CONTROL port on the
LM-BCC in back slot 7/8, and the terminal's power cord plugged into the appropriate voltage wall outlet.
Step 6
If desired, a printer is connected to the AUXILIARY port on the LM-BCC in back slot 7/8 and the printer
power cord is plugged into the appropriate power outlet.
Step 7
If desired, modems are connected to the CONTROL port or AUXILIARY port, as applicable, on the
LM-BCC in back slot 7/8, and the modem power cords plugged into the appropriate power wall outlet.
Summary of Contents for BPX 8650
Page 49: ...P A R T 1 The BPX Switch ...
Page 50: ......
Page 159: ...P A R T 2 Installation ...
Page 160: ......
Page 273: ...P A R T 3 Initial Configuration and Network Management ...
Page 274: ......
Page 311: ...P A R T 4 Configuring Connections ...
Page 312: ......
Page 487: ...P A R T 5 Troubleshooting and Maintenance ...
Page 488: ......
Page 533: ...P A R T 6 BPX Specifications ...
Page 534: ......
Page 555: ...P A R T 7 Appendices ...
Page 556: ......