12-5
Cisco BPX 8600 Series Installation and Configuration
Release 9.3.30, Part Number 78-12907-01 Rev. E0, May 2005
Chapter 12 Installing the T3/E3 Cable Management Tray
Connecting Cables to BXM T3/E3 Cards
Figure 12-5 Installing BXM T3/E3 Cable Bracket
Connecting Cables to BXM T3/E3 Cards
To route the cables as shown in Figure 12-6 and Figure 12-7, use the following procedure:
Step 1
Connect the cables to the card by pushing on the SMB connector locking sleeves as you push the cable
connectors on to the card connectors.
Step 2
Dress the cables upward to provide a service loop.
Step 3
Bundle the cables by using cable ties.
Step 4
Wrap the cable strap around the cables and secure them to the cable management bracket.
Note
To disconnect cables from a card, pull on the cable connector locking sleeve as you pull the
cable connector away from the card connector.
H10011
RX1
TX1
RX2
TX2
RX3
TX3
RX4
TX4
Cable
strap
Captive
screw
Card
bracket
BXM
Summary of Contents for BPX 8650
Page 49: ...P A R T 1 The BPX Switch ...
Page 50: ......
Page 159: ...P A R T 2 Installation ...
Page 160: ......
Page 273: ...P A R T 3 Initial Configuration and Network Management ...
Page 274: ......
Page 311: ...P A R T 4 Configuring Connections ...
Page 312: ......
Page 487: ...P A R T 5 Troubleshooting and Maintenance ...
Page 488: ......
Page 533: ...P A R T 6 BPX Specifications ...
Page 534: ......
Page 555: ...P A R T 7 Appendices ...
Page 556: ......