9
9
9-39
9-39
Installation > Installation > Preparing connection of the main power supply
Installation > Installation > Preparing connection of the main power supply
Preparing connection of the main power supply
CAUTION :
When turning off the main power, be sure to go through the following steps to protect the hard disk of this product.
1) Press the power switch on the control panel for 3 seconds or more.
2) Work on the touch panel by following the instruction on the shutdown sequence screen.
3) “Executing shutdown” is displayed.
Once a message, which tells that the power of the option devices can be turned off, is shown on the control panel of the host machine, turn OFF the power switch of the
pickup and delivery options.
4) The main power switch of this equipment is automatically turned OFF once the shutdown process is complete.
5) Disconnect the power plug (for the outlet).
• Fixing assembly
• Host machine
1) Connect the 2 power plugs.
• Host machine
• Fixing assembly
CAUTION :
Use the correct power cord to mach the location/area of installation.
Make sure not to leave unused power cord at the site.
NOTE:
• The leakage breaker (for power supply of host machine) must be turned ON.
• The leakage breaker (for power supply of fixing heater) must be turned ON.
x2
Leakage breaker
(for power supply of
host machine)
Fixing heater switch
The leakage breaker
(for power supply of
environmental heater)
F-9-84
F-9-85
Summary of Contents for imagePRESS 1110
Page 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Page 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Page 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Page 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...