9
9
9-8
9-8
Installation > Unpacking > Unpacking
Installation > Unpacking > Unpacking
3) Pull the plastic down to the bottom.
F-9-15
4) Lift the host machine with a forklift to put down the machine from the pallet.
CAUTION : Note when inserting the forklift claw under
the host machine
• Do not make the forklift claw damage the adjusters.
• Do not lift the machine together with the plastic.
F-9-16
5) Move the host machine to the installation site.
CAUTION :
Be sure to hold the indicated area to move the host machine to prevent the deformation.
F-9-17
6) Remove all the tapes attached to the external surface of the host machine.
F-9-18
Summary of Contents for imagePRESS 1110
Page 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Page 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Page 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Page 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...