![Zontes ZT350-EURO V 2022 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/zontes/zt350-euro-v-2022/zt350-euro-v-2022_service-manual_937717069.webp)
8-FRONT FORK COMPONENT
68
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251112-001093 M6×16 Hexagon flange bolts (color Zinc)
3
2
ZT350-X head cover panel
1
3
1274100-007000
ZT250-S flanging sleeve(φ6.4×φ9×6
+
φ20×2)
2
4
1244100-004000 ZT250-S Flanging bushing buffer
2
5
1240300-007000 HJ125-6 Battery rubber gasket
6
6
1224100-010000 ZT250-S swell nail
2
PROCEDURE:
●
Head cover panel assembly
Removed bolts
⑴
from the bottom of the hood panel.
Remove the two bolts
⑴
on the top of the headhopper panel, remove the bushing
⑶
.
Use a small cross screw knife to press down the center of the expansion nail and remove the two expansion
nails
⑹
.
Grasp the two sharp corners near the expansion nails
⑹
, and gently shake the cover panel
⑵
to loosen the hood
on both sides.
As shown in the direction of the arrow
③
, push the headhopper to the bottom of the direction, and push the
four buckle
②
on both sides.
If you need to replace the rubber pad
⑸
to tear it off from the headhopper panel
⑵
. Remove the buffer glue
⑷
from the head cover panel
⑵
.
CAUTION:
●
Keep protective measures to prevent scratching.
●
Pay attention when you open the buckle to prevent the card buckle from broken due to excessive strength.
Fig.14 FRONT FORK
COMPONENT
Cover panel component
Содержание ZT350-EURO V 2022
Страница 1: ...ZT350 X EURO V Service manual 2022 5 3...