![Zontes ZT350-EURO V 2022 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/zontes/zt350-euro-v-2022/zt350-euro-v-2022_service-manual_937717013.webp)
1-FRAME&ELECTRONIC COMPONENT
12
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
4014300-011000 ZT350-X frame after-sales assembly(including seat/310
1
2
1130900-026000 ZT250-S upper steel bowl
1
After-sales
3
1134300-001000 ZT350-R lower seat ring
1
After-sales
4
1264100-001000 ZT250-S side stand spring
1
5
1271200-165000 ZT310-T side bracket (short/dark gray)
1
6
1251100-088094 Non-standard bolt M10×1.5×43(Dacromet)
1
7
1251300-057093 Non-standard nut M10×1.5(Dacromet)
1
45±5N.m
8
1251700-025091 ZT250-S side stand sleeve
1
PROCEDURE:
●
Checking the steel bowl
Checking whether the steel bowl
⑵
and
⑶
is frayed, if as it, please replace it. Fix the cushion loop well and
paint the lubricating grease on it with appropriate tool.
●
Sider support
Using the cross screwdriver to remove the side support spring
⑷
, using 14#sleeve or plum blossom wrench
remove the nut
⑺
and then remove bolt
⑹
. Remove the side support
⑸
and bush
⑻
, paint the lubricating grease
on the bush
⑻
when re-assembling ,then put it into the frame
⑴
.
CAUTION:
●
You need to remove the direction first to the assembly, the direction column assembly, etc.
●
All parts should be properly assembled in place. Pay attention to safety when disassembling the side bracket
spring. Circles need to apply lubricating oil to reduce the pupil rotation resistance.
Fig.5 FRAME&ELECTRONIC
COMPONENT
Frame, side bracket
Содержание ZT350-EURO V 2022
Страница 1: ...ZT350 X EURO V Service manual 2022 5 3...