![Zontes ZT350-EURO V 2022 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/zontes/zt350-euro-v-2022/zt350-euro-v-2022_service-manual_937717010.webp)
1-FRAME&ELECTRONIC COMPONENT
9
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1250105-138093 GB5789M6×20 (environmental color)
1
2
1100100-820000 ZT350-R brake hose RC-HU section
(
A
)
1
3
1184200-004000 ZT310 horn
1
4
1274300-065000 ZT350-VX front oil outlet pipe bracket
1
5
1251112-001093 M6×16 Hexagon flange bolts (color Zinc)
1
6
1250205-040095 GB70.1 inner hex bolt M8×16(color Zinc)
2
7
1184100-012000 ZT250-S shut down switch
1
8
1274100-095000 ZT250-S Flameout switch wire fixing bracket
1
9
1274100-017000 ZT250-S cable buckle
2
10
1224100-037000 Grade 0 flame retardant tie (black 3.6×295)
1
11
1050958-007000 ZT350 EFI high voltage line
1
12
1251100-061093 M6×22 Hex flang bolt thread level 8.8 (color Zinc)
2
13
1050958-006000 ZT350 lgnition oil body
1
14
1244200-139000 ZT310 rubber buckle (120mm)
1
Fig.2 FRAME&ELECTRONIC
COMPONENT
Electricity assembly 2
PROCEDURE:
●
Horn
Unplug the horn plug, remove the bolt
⑴
with 10# sleeve, pull out the brake hose
⑵
, remove the bolt
⑸
with
8# sleeve, and remove the horn
⑸
and oil outlet pipe support
⑷
.
●
Shut down switch
Find the plug of the flameout switch
⑺
and pull it off;
⑷
press the thread buckle inward in the direction of the
arrow shown in the figure and pull it out with force; Cut the tie
⑸
. Remove the bolt
⑻
with 6# hexagon socket,
remove the bracket
⑹
and the flameout switch
⑺
.
●
Ignition coil
Find and pull out the plug of ignition coil
⒀
, untie the wire buckle
⒁
, pull out the EFI high-voltage wire in the
direction indicated by the arrow in the figure, and remove the EFI high-voltage wire
⑾
; Use 8# sleeve to remove
two bolts
⑾
and remove ignition coil
⒀
.
CAUTION:
●
When take off the plug can't drag any cable.
●
Pay attention to the force when removing the buckle to prevent damage to the buckle.
Содержание ZT350-EURO V 2022
Страница 1: ...ZT350 X EURO V Service manual 2022 5 3...