
5-69
ENG
CRANKSHAFT AND BALANCER SHAFT
Order
Job name/Part name
Q’ty
Remarks
12
Balancer shaft
1
13
Balancer driven gear
1
14
Bearing retainer
1
15
Bearing
1
16
Circlip
1
17
Bearing
1
For installation, reverse the removal proce-
dure.
E
New
LT
E
E
E
E
16
17
2
2
2
3
4
2
2
New
5
6
8
9
10 11
12
15
14
7
6
5
New
13
É
É
E
10 Nm (1.0 m
•
kg, 7.2 ft
•
lb)
È
:
1
35 Nm (3.5 m
•
kg, 25 ft
•
lb)
É
:
È
LS
2
2
2
Содержание FX Nytro FX10MTRAX
Страница 2: ......
Страница 8: ......
Страница 63: ...INSP ADJ ...
Страница 200: ...3 3 CHAS INSTALLATION 1 Install Headlight assembly 1 2 Headlight stay Installed position a 16 0 mm 0 63 in a 1 2 COVERS ...
Страница 577: ...FI ...
Страница 633: ...FI ...
Страница 695: ... ELEC ...
Страница 709: ... ELEC ...
Страница 747: ... ELEC ...
Страница 755: ... ELEC ...
Страница 848: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 850: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 854: ......
Страница 855: ......