
4-6
POWR
TR
PRIMARY SHEAVE AND DRIVE V-BELT
Rivet replacement steps:
• Remove old rivet with the appropriate drill.
• Insert the rivet
1
from the ID mark
2
side.
• Press or peen the rivet head so that the diame-
ter
a
of the rivet head measures 8.2 mm
(0.32 in) or larger.
6. Measure:
• Bushing inside diameter
Out of specification
→
Replace as a set.
NOTE:
When replacing the weight and roller bushings, use
the YXR clutch bushing jig kit.
Ê
Removing
Ë
Installing
Bushing inside diameter:
Roller
È
:
New: 9.077 mm (0.357 in)
Wear limit: 9.3 mm (0.366 in)
Weight
É
:
New: 8.077 mm (0.318 in)
Wear limit: 8.3 mm (0.327 in)
YXR clutch bushing jig kit:
90890-01528, YS-39752
È
É
Ê
Ë
ASSEMBLY
1. Install:
• Sliding sheave
(onto the spider)
NOTE:
Be sure the sliding sheave match mark (X) is
aligned with the spider match mark (X).
Содержание FX Nytro FX10MTRAX
Страница 2: ......
Страница 8: ......
Страница 63: ...INSP ADJ ...
Страница 200: ...3 3 CHAS INSTALLATION 1 Install Headlight assembly 1 2 Headlight stay Installed position a 16 0 mm 0 63 in a 1 2 COVERS ...
Страница 577: ...FI ...
Страница 633: ...FI ...
Страница 695: ... ELEC ...
Страница 709: ... ELEC ...
Страница 747: ... ELEC ...
Страница 755: ... ELEC ...
Страница 848: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 850: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 854: ......
Страница 855: ......