
4-52
POWR
TR
SLIDE RAIL SUSPENSION
Order
Job name/Part name
Q’ty
Remarks
S
Collar
2
T
Rear suspension bracket
2
U
Rear
shock
absorber
1
V
Spacer
4
W
Collar
2
X
Wheel
bracket
2
Y
Guide
wheel
2
Z
Guide
plate
2
[
Bushing
2
\
Tension
spring
2
]
Collar
2
T
T
S
S
V
V
V
V
W
W
b
k
k
a
b
U
a
[
\
Z
Y
X
É
h
f
g
\
Ê
Ê
É
Ê
i
d
e
g
j
j
X
Y
Z
]
]
[
_
Ê
f
c
È
È
Ë
Ë
Ë
Ë
Ê
Ê
LT
New
New
LT
LT
LT
LT
9 Nm (0.9 m
•
kg, 6.5 ft
•
lb)
É
:
60 Nm (6.0 m
•
kg, 43 ft
•
lb)
Ê
:
72 Nm (7.2 m
•
kg, 52 ft
•
lb)
Ë
:
4 Nm (0.4 m
•
kg, 2.9 ft
•
lb)
È
:
Содержание FX Nytro FX10MTRAX
Страница 2: ......
Страница 8: ......
Страница 63: ...INSP ADJ ...
Страница 200: ...3 3 CHAS INSTALLATION 1 Install Headlight assembly 1 2 Headlight stay Installed position a 16 0 mm 0 63 in a 1 2 COVERS ...
Страница 577: ...FI ...
Страница 633: ...FI ...
Страница 695: ... ELEC ...
Страница 709: ... ELEC ...
Страница 747: ... ELEC ...
Страница 755: ... ELEC ...
Страница 848: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 850: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7 ...
Страница 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Страница 854: ......
Страница 855: ......