Emprise 7000 Installation and Service Guide 3
Power Up and Configure the Emprise 7000 Components
Task
Reference
Refer to the Emprise 7000 Configuration Guide for the IP
addresses needed for the following steps.
http://support.xiotech.com
Power up and configure the switches.
•
Storage Fabric
•
Ethernet
•
Front-end fabric SAN switch
See page 51.
See page 54.
See “Zoning
Requirements” at
http://support.xiotech.com
ISE:
•
Power on all ISE in logical order
•
Run the setup utility
•
Verify each IP address
See page 55.
ICON appliance:
•
Power up the ICON
•
Upgrade the ICON
See page 56.
Connect the power cords to the controllers. If the
controllers do not power up, power them up. Configure
the controllers.
See page 57.
Power up and zone the servers.
See page 59.
Log in to ICON Manager and configure the Emprise
7000.
See page 60.