Dionex ICS-5000
+
Installation Instructions
106
Doc. 065447-02 12/14
Flushing and Conditioning the Dionex EGC
1. Locate the yellow 0.5 mL/min, 7 MPa (1000 psi) backpressure coil
(P/N 053765) in the EG Ship Kit (P/N 072047).
2. Connect the coil to the
ELUENT OUT
port of the RFIC
+
Eluent Degasser
). Direct the open end to a waste container. This is a
temporary connection.
NOTE
The backpressure must be at least 1.4 MPa (200 psi).
Figure 4-28. Flow Schematic for Conditioning the Dionex EGC:
Analytical Flow Version
EGC
IN
From Pump
EGC
OUT
Eluent
Out
To Waste
(via EG
rear wall)
Eluent
In
RFIC
Eluent
Degasser
Vent
+
EGC VENT
To Waste
(via EG
rear wall)
EGC
Inlet
Outlet
To Waste
Dionex EGC Flushing:
Pump at 1 mL/min for 10 min
Dionex EGC Conditioning:
EGC concentration at 50 mM
Pump at 1 mL/min for 30 min