Dionex ICS-5000
+
Installation Instructions
10
Doc. 065447-02 12/14
substitute different tubing. This tubing is precision cut at the factory,
using a specialized cutter. Precision cut tubing is included in the Dionex
IC Cube Tubing Kit (P/N 072186).
1.6.1
Connecting High-Pressure Tube Fittings
1. Install the fitting bolt and ferrule onto the tubing. Position the ferrule at
least 2 mm (0.1 in) from the end of the tubing (see
2. Insert the tubing into the port until it stops.
3. While maintaining pressure on the tubing to keep it in place in the port,
tighten the fitting bolt fingertight and then tighten the fitting further by
following the instructions in
Figure 1-2. Ferrule and Fitting Bolt Placement for Tubing Connections
Figure 1-3. Ferrule and Fitting Bolt Placement for Tubing Connections
Correct placement of ferrule
and fitting on tubing
Incorrect placement of ferrule
and fitting on tubing