B • Installing DC Options
Doc. 065447-02 12/14
149
B.4.2
Installing a Low-Pressure Valve on the AM
1. Insert the two tabs on the valve
mounting plate into the slots for
either the left or right valve
mounting position.
2. While holding the valve mounting
plate firmly against the AM,
tighten the captive thumbscrew
(see
3. Thread the connector and wires
through the opening next to the
valve.
Figure B-27. Low-Pressure Valve Installation
(Left Valve Mounting Position)
4. Plug the valve connector into the appropriate connector on the AM prep
NOTE
For instructions on how to install low-pressure valves
outside the AM, refer to
B.4.3
Installing the RCH-1 Reaction Coil Heater on the AM
1. Note the two ball studs on the back of the heater. Align the ball studs with
the two receivers on the wall of the AM heater compartment.
2. Push the heater firmly onto the receivers and snap it into place.
3. Route the heater cable through the cutout to the right of the heater. Plug
the cable into the
HEATER
connector on the AM prep board (see