Dionex ICS-5000
+
Installation Instructions
110
Doc. 065447-02 12/14
1. In the tubing chase on the lower-left side of the EG, locate the line labeled
TO CR-TC REGEN IN
(orange label). Connect this line to the Dionex CR-
TC
REGEN IN
port. Route the other end of the line from the EG rear panel
to the DC.
2. Connect the line from the Dionex RFIC
+
Eluent Degasser labeled
TO CR-
TC
ELUENT OUT
(yellow label)
to the Dionex CR-TC
ELUENT OUT
port.
3. Pull the line labeled
DEGAS VENT
through the opening in the rear wall
above the bulkhead connectors and connect the line to the luer adapter in
the
VENT
port on the Dionex RFIC
+
Eluent Degasser. Direct the free end
of the line to a waste container.
4. Check that no liquid lines are caught under the Dionex CR-TC and then
push the device firmly onto the ball studs on the mounting plate. The
Dionex CR-TC clicks into place when properly installed.
5. Connect the Dionex CR-TC electrical cable.
6. For a dual-analysis system, repeat the steps above to install the second
Dionex EGC and CR-TC.
4.2.8
Plumbing the DC for Analytical IC Applications
This section provides brief installation and plumbing instructions for the
guard column, separator column, and suppressor.
Before Beginning
1. Refer to the column and suppressor manuals for detailed installation and
start-up instructions (including backpressure requirements for the
suppressor).
Also refer to the example plumbing diagrams on the DC lower door or in
Chapter 3, “Configurations,” in
Dionex ICS-5000
+
Ion Chromatography
Operator’s Manual
(Document No. 065446).
The manuals are provided on the Thermo Scientific Reference Library
DVD (P/N 053891).
2. Remove the guard column, separator column, and suppressor from their
boxes.