Dionex ICS-5000
+
Installation Instructions
76
Doc. 065447-02 12/14
3. Use the two tubing assemblies to connect the injection valve
ELUENT OUT
port to the cell
IN
port
4. Remove the union between the
EG DEGAS IN
and
EG DEGAS OUT
lines on
the pre-assembled tubing chain (see
). Connect the lines to their
respective ports on the EG degas cartridge.
5. Connect the
EG DEGAS ELUENT OUT
line to the injection valve
ELUENT
IN
port.
6. Set the pump
Purge
rate to 0.1 mL/min and the
Duration
to 1800 s. Click
Prime
. Do not open the purge valve (you can cancel the Ready Check
message that appears). The regenerant path is flushed for 30 minutes.
NOTE
The pump pressure is typically 3 to 5 MPa (400 to
700 psi) at 0.100 mL/min.
7. Monitor the waste flow from the EG degas. When no bubbles are present,
the path is completely filled and flushed.
Figure 4-3. Flow Schematic for Filling and Flushing the Regenerant path
in a Capillary CD System
5
6
3
CRD
CES
2
SAMPLE OUT
REGEN IN
ELUENT OUT
ELUENT IN
SAMPLE IN
ELUENT OUT
ELUENT IN
ELUENT OUT
ELUENT IN
ELUENT OUT
ELUENT IN
EG
DEGAS
ELUENT IN
ELUENT OUT
VENT
5000 psi
CRD
BYPASS
Conductivity Detector
(Capillary)
CELL IN
CELL OUT
EG DEGAS
IN
EG DEGAS
OUT
To waste
From pump
Tubing P/N 072188
and P/N 072189
(Temporary
connection)
Fill and flush regenerant path (CD):
Pump purge mode at 0.1 mL/min for 30 min
Through
tubing chase
to rear panel