Dionex ICS-5000
+
Installation Instructions
96
Doc. 065447-02 12/14
4.2.2
System Plumbing Checklists
The system plumbing steps and the order in which they are performed vary
slightly, depending on the installed detector. The following checklists outline
the steps for each detection type.
4.2.3
Plumbing the Static Mixer or Trap Column
A static mixer is mounted on the pump component panel at the factory and the
inlet of the static mixer is pre-plumbed to the pump outlet. In addition, several
high-pressure trap columns are available for use with the Dionex ICS-5000
+
system. When a trap column is used, it replaces the static mixer.
CD System Plumbing Checklist for Analytical IC
Page
Plumb the static mixer or trap column
Complete the IQ checklist
Perform the system function test
Complete the OQ (optional)
Plumb the EG
Plumb the DC
Plumb the TC
Connect waste lines to the gas separator waste tube
Equilibrate the system
ED System Plumbing Checklist for Analytical IC
Page
Plumb the static mixer or trap column
Plumb the EG
Complete the IQ checklist
Perform the system function test
Complete the OQ (optional)
Install the ED amperometry cell
Plumb the DC
Connect waste lines to the gas separator waste tube
Equilibrate the system