4 • System Plumbing
Doc. 065447-02 12/14
85
3. To flush the separator column:
a.
If you did not install a guard column, connect the 210 mm (8.27 in)
precision cut tubing, labeled
VALVE PORT 3
(P/N 072187), to the
ELUENT OUT
port (3) of the injection valve. Connect the other end to
the separator column.
b. Verify that the CR-TC is off and the pump flow and Dionex EGC are
set to the conditions specified in the QAR.
c.
Flush the separator column to waste for 20 minutes.
Installing the Columns in the Capillary Column Tray
1. Temporarily disconnect the column inlet tubing from the
ELUENT OUT
port (3) of the injection valve.
2. Cut off the label from the separator column along the dotted line and slide
the label into the holder on the front of the tray (see
Figure 4-9. Capillary Column Tray with Column Label
Label from
Separator Column