measure has to be performed in a specific case, must be decided project-specifically.
Grayed-out cells mean that a measure is not required.
Note
If the version is changed and the SIMOTION controller replaced at the same time, then all
measures apply; the measures must be performed in the TOP-DOWN sequence according to
the table.
Service and maintenance
8.1 Overview
SIMOTION D4x5-2
Commissioning and Hardware Installation Manual, 03/2018, A5E33441636B
339