487
Replacing User-serviceable Parts
Section 10-2
!Caution
You must complete this procedure within five minutes after turning OFF the
power to the CPU Unit to ensure memory backup. If the procedure is not com-
pleted within 5 minutes, data may be lost.
!Caution
UL standards require that batteries be replaced by experienced technicians.
Always place an experienced technician in charge or battery replacement.
!Caution
Turn ON the power after replacing the battery for a CPU Unit that has been
unused for a long time. Leaving the CPU Unit unused again without turning
ON the power even once after the battery is replaced may result in a shorter
battery life.
Note The battery error will automatically be cleared when a new battery is inserted.
Содержание CP1H-CPU - 05-2006
Страница 1: ...OPERATION MANUAL CP1H CPU Unit SYSMAC CP Series CP1H X40D CP1H XA40D CP1H Y20DT D Cat No W450 E1 02...
Страница 2: ...CP1H X40D CP1H XA40D CP1H Y20DT D CP1H CPU Unit Operation Manual Revised May 2006...
Страница 3: ...iv...
Страница 11: ...xii TABLE OF CONTENTS...
Страница 15: ...xvi...
Страница 19: ...xx...
Страница 31: ...xxxii Conformance to EC Directives 6...
Страница 71: ...40 Function Blocks Section 1 5...
Страница 133: ...102 Computing the Cycle Time Section 2 7...
Страница 169: ...138 CPM1A Expansion I O Unit Wiring Section 3 6...
Страница 411: ...380 Clock Section 6 8...
Страница 519: ...488 Replacing User serviceable Parts Section 10 2...
Страница 527: ...496 Standard Models Appendix A...
Страница 535: ...504 Dimensions Diagrams Appendix B...
Страница 628: ...597 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Страница 629: ...598 Connections to Serial Communications Option Boards Appendix F...
Страница 659: ...628 PLC Setup Appendix G...
Страница 665: ...634 Index work words 159 write protection 370...
Страница 667: ...636 Revision History...