201
Interrupt Functions
Section 5-1
New PV Setting in NV and NV+1
Ladder Program
Examples
Example 1: High-speed
Counter (Linear Mode)
In this example, high-speed counter 0 operates in linear mode and starts
interrupt task 10 when the PV reaches 30,000 (0000 7530 hex).
1,2,3...
1.
Set high-speed counter 0 in the PLC Setup’s Built-in Input Tab.
2.
Set the target-value comparison table in words D10000 to D10003.
3.
Create the program for interrupt task 10. Always put an END(001) instruc-
tion at the program’s last address.
Operand
Settings
P
Port specifier
#0000 to #0003 Pulse outputs 0 to 3
#0010
High-speed counter 0
#0011
High-speed counter 1
#0012
High-speed counter 2
#0013
High-speed counter 3
#0100 to #0107 Input interrupts 0 to 7 (in counter mode)
#1000 or #1001 PWM(891) output 0 or 1
C
Control data
#0000
Start comparison.
#0001
Stop comparison.
#0002
Change the PV.
#0003
Stop pulse output.
NV
First word of
new PV
NV and NV+1 contain the new PV when C is set to #0002
(change the PV).
New PV (rightmost 4 digits)
New PV (leftmost 4 digits)
Setting range for pulse outputs and high-speed counter inputs:
0000 0000 to FFFF FFFF hex
Setting range for input interrupts (counter mode):
0000 0000 to 0000 FFFF hex
Item
Setting
High-speed counter 0
Use counter
Counting mode
Linear mode
Circular Max. Count
---
Reset method
Software reset
Input Setting
Up/Down inputs
Word
Setting
Function
D10000
#0001
Number of target values = 1
D10001
#7530
Rightmost 4 digits of the target value 1 data Target value =
30,000
(0000 7530 hex)
D10002
#0000
Leftmost 4 digits of the target value 1 data
D10003
#000A
Bit 15: 0 (incrementing)
Bits 0 to 7: A hex (interrupt task number 10)
Содержание CP1H-CPU - 05-2006
Страница 1: ...OPERATION MANUAL CP1H CPU Unit SYSMAC CP Series CP1H X40D CP1H XA40D CP1H Y20DT D Cat No W450 E1 02...
Страница 2: ...CP1H X40D CP1H XA40D CP1H Y20DT D CP1H CPU Unit Operation Manual Revised May 2006...
Страница 3: ...iv...
Страница 11: ...xii TABLE OF CONTENTS...
Страница 15: ...xvi...
Страница 19: ...xx...
Страница 31: ...xxxii Conformance to EC Directives 6...
Страница 71: ...40 Function Blocks Section 1 5...
Страница 133: ...102 Computing the Cycle Time Section 2 7...
Страница 169: ...138 CPM1A Expansion I O Unit Wiring Section 3 6...
Страница 411: ...380 Clock Section 6 8...
Страница 519: ...488 Replacing User serviceable Parts Section 10 2...
Страница 527: ...496 Standard Models Appendix A...
Страница 535: ...504 Dimensions Diagrams Appendix B...
Страница 628: ...597 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Страница 629: ...598 Connections to Serial Communications Option Boards Appendix F...
Страница 659: ...628 PLC Setup Appendix G...
Страница 665: ...634 Index work words 159 write protection 370...
Страница 667: ...636 Revision History...