9.1 Inspection Schedule
9-2
• The inspection interval must be based on the servo power supply on time.
• For axes which are used very frequently (in handling applications, etc.), it is recom-
mended that inspections be conducted at shorter intervals. Contact your Yaskawa repre-
sentative.
Table. 7 Inspection Items
Items
*4
Schedule
Method
Operation
Inspection Charge
Daily
1000
H
Cycle
6000
H
Cycle
12000
H
Cycle
24000
H
36000
H
Specified
Person
Licensee
Service
Company
•
Tram mark
¡
Visual
Check tram mark
accordance and
damage at the home
position
¡
¡
¡
‚
External
lead
¡
Visual
Check for damage
and deterioration of
leads.
¡
¡
¡
ƒ
Working area
and
manipulator
¡
Visual
Clean the work area
if dust or spatter is
present. Check for
damage and outside
cracks.
¡
¡
¡
„
LU-axes
motor
¡
Visual
Check for grease
leakage.
*5
¡
¡
¡
…
Baseplate
mounting
bolts
¡
Spanner
Wrench
Tighten loose bolts.
Replace if necessary.
¡
¡
¡
†
Cover mount-
ing screws
¡
Screw-
driver,
Wrench
Tighten loose bolts.
Replace if necessary.
¡
¡
¡
‡
SLURBT-
axes
motor
connector
¡
Manual
Check for loose con-
nectors and tighten if
necessary.
¡
¡
¡
ˆ
Base connec-
tors
¡
Manual
Check for loose con-
nectors.
¡
¡
¡
‰
S-axis cable
protecter
¡
Visual
Remove the cover
and check for wear.
¡
¡
Š
L-axis
balancer
¡
Visual
Grease
Gun
Tighten loose nuts
and shaft. Supply
grease.
¡
¡
RB-axes tim-
ing belt
¡
Manual
Check for belt
tension and wear.
¡
¡
N OT E
1 1
Содержание SK300X
Страница 2: ......
Страница 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Страница 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Страница 21: ...viii...
Страница 25: ...xii...
Страница 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Страница 59: ...4 3 Connection Methods 4 12...
Страница 67: ...6 1 Movement of the Axes 6 4...
Страница 73: ...8 2...
Страница 74: ......
Страница 93: ...3 3 Location 3 6...
Страница 99: ...4 2 Cable Connection 4 6...
Страница 102: ...5 4 Dimensions and Working Range 5 3 5 4 Dimensions and Working Range Fig 10 a Dimesions and Working Range YR SK300 J0...
Страница 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Страница 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Страница 109: ...6 2 Wrist Flange 6 4...
Страница 133: ...9 2 Notes on Maintenance Procedures 9 18...
Страница 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Страница 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Страница 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Страница 234: ...2 8 General I O Signal Assignment 2 72...
Страница 270: ...4 4 Recommended Spare Parts 4 30...
Страница 285: ...xiv...
Страница 286: ...Setup Diagnosis...
Страница 287: ......
Страница 289: ...1 2...
Страница 297: ...2 1 Protection Through Security Mode Settings 2 8...
Страница 395: ...3 17 File Initialize 3 98...
Страница 417: ...4 2 Addition of Base and Station Axis 4 22...
Страница 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Страница 436: ...Hardware...
Страница 437: ......
Страница 447: ...6 4 Equipment Configuration 6 10...
Страница 456: ...8 8 Open Phase Check 8 8...
Страница 476: ...9 4 Recommended Spare Parts 9 20...
Страница 477: ...Alarm Error...
Страница 478: ......
Страница 523: ......
Страница 524: ......
Страница 525: ......
Страница 526: ......
Страница 527: ......
Страница 528: ......
Страница 529: ......
Страница 530: ......
Страница 531: ......
Страница 532: ......
Страница 533: ......
Страница 534: ......
Страница 535: ......
Страница 536: ......
Страница 537: ......
Страница 538: ......
Страница 539: ......
Страница 540: ......
Страница 541: ......
Страница 542: ......
Страница 543: ......
Страница 544: ......
Страница 545: ......
Страница 546: ......
Страница 547: ......
Страница 548: ......
Страница 549: ......
Страница 550: ......
Страница 551: ......
Страница 552: ......
Страница 553: ......