3.11 ARM Control
3-50
"
Robot Setup Condition
It is necessary to set the following robot setup condition to execute the ARM control appropri-
ately.
• Robot installation angle
• S-head payload
• U-arm payload
Robot installation angle
The angle of the manipulator installed relative to ground is set in ANGLE REL. TO GROUND
to calculate the gravity moment which loads to each axis of the manipulator.
The robot installation angle sets how much X axis of the robot coordinates has inclined with
the earth around Y axis of the robot coordinates. The direction of + in the U axis operation
from the home position posture of the manipulator becomes direction of + of the robot installa-
tion angle. Therefore, the robot installation angle for a vertical downward wall mount specifi-
cation becomes -90 degrees.
<Example>
Because the gravity moment which loads to each axis can't be calculated correctly when this
value is not correctly set, it can not be possible to control the manipulator appropriately. Set
the value correctly. Especially, note the direction “+” or “-”.
Only rotation angle around Y axis of the robot coordinates can be set in the robot installa-
tion angle.
Contact YASKAWA representative when robots is installed to incline Y axis of the robot
coordinates relative to ground.
Robot
installation
Angle
+
-
X
Z
Y
0 degrees
-90 degrees
+90 degrees
180 degrees
N OT E
Содержание SK300X
Страница 2: ......
Страница 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Страница 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Страница 21: ...viii...
Страница 25: ...xii...
Страница 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Страница 59: ...4 3 Connection Methods 4 12...
Страница 67: ...6 1 Movement of the Axes 6 4...
Страница 73: ...8 2...
Страница 74: ......
Страница 93: ...3 3 Location 3 6...
Страница 99: ...4 2 Cable Connection 4 6...
Страница 102: ...5 4 Dimensions and Working Range 5 3 5 4 Dimensions and Working Range Fig 10 a Dimesions and Working Range YR SK300 J0...
Страница 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Страница 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Страница 109: ...6 2 Wrist Flange 6 4...
Страница 133: ...9 2 Notes on Maintenance Procedures 9 18...
Страница 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Страница 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Страница 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Страница 234: ...2 8 General I O Signal Assignment 2 72...
Страница 270: ...4 4 Recommended Spare Parts 4 30...
Страница 285: ...xiv...
Страница 286: ...Setup Diagnosis...
Страница 287: ......
Страница 289: ...1 2...
Страница 297: ...2 1 Protection Through Security Mode Settings 2 8...
Страница 395: ...3 17 File Initialize 3 98...
Страница 417: ...4 2 Addition of Base and Station Axis 4 22...
Страница 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Страница 436: ...Hardware...
Страница 437: ......
Страница 447: ...6 4 Equipment Configuration 6 10...
Страница 456: ...8 8 Open Phase Check 8 8...
Страница 476: ...9 4 Recommended Spare Parts 9 20...
Страница 477: ...Alarm Error...
Страница 478: ......
Страница 523: ......
Страница 524: ......
Страница 525: ......
Страница 526: ......
Страница 527: ......
Страница 528: ......
Страница 529: ......
Страница 530: ......
Страница 531: ......
Страница 532: ......
Страница 533: ......
Страница 534: ......
Страница 535: ......
Страница 536: ......
Страница 537: ......
Страница 538: ......
Страница 539: ......
Страница 540: ......
Страница 541: ......
Страница 542: ......
Страница 543: ......
Страница 544: ......
Страница 545: ......
Страница 546: ......
Страница 547: ......
Страница 548: ......
Страница 549: ......
Страница 550: ......
Страница 551: ......
Страница 552: ......
Страница 553: ......