
9.2 Notes on Maintenance Procedures
9-7
Fig. 21 (a) Battery Connection for SLU-Axes
Fig. 21 (b) Battery Connection for RBT-Axes
1.
Turn the XRC main power supply off.
2.
Remove the connector base, and grease tube from the union.
3.
Remove the battery unit mounting screw on the support.
4.
Remove the plastic tape (insulation tape) protecting the connection part of the battery
unit in the manipulator.
5.
Connect the new battery.
6.
Remove the old battery.
7.
Protect the connection part of the battery unit in the manipulator with plastic tape (insu-
lation tape).
8.
Mount the battery unit with the screw, connect the grease tube to the union, and then
mount the connector base.
Remove the old battery unit after connecting the new one so that the encoder absolute
data does not disappear.
Do not pinch the cable when the base connector is installed.
See Procedure 4
See Procedure 5
New battery unit
Internal wires
for SLU-axes
Battery unit for SLU-axes
before replacement
See Procedure 6
See Procedure 7
a: Insertion-type pin terminal (Male)
b: Insertion-type pin terminal (Female)
See Procedure 6
See Procedure 7
Battery unit for RBT-axes
before replacement
Internal wires
for RBT-axes
See Procedure 4
See Procedure 5
New battery unit
a: Insertion-type pin terminal (Male)
b: Insertion-type pin terminal (Female)
N OT E
N OT E
Содержание SK300X
Страница 2: ......
Страница 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Страница 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Страница 21: ...viii...
Страница 25: ...xii...
Страница 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Страница 59: ...4 3 Connection Methods 4 12...
Страница 67: ...6 1 Movement of the Axes 6 4...
Страница 73: ...8 2...
Страница 74: ......
Страница 93: ...3 3 Location 3 6...
Страница 99: ...4 2 Cable Connection 4 6...
Страница 102: ...5 4 Dimensions and Working Range 5 3 5 4 Dimensions and Working Range Fig 10 a Dimesions and Working Range YR SK300 J0...
Страница 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Страница 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Страница 109: ...6 2 Wrist Flange 6 4...
Страница 133: ...9 2 Notes on Maintenance Procedures 9 18...
Страница 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Страница 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Страница 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Страница 234: ...2 8 General I O Signal Assignment 2 72...
Страница 270: ...4 4 Recommended Spare Parts 4 30...
Страница 285: ...xiv...
Страница 286: ...Setup Diagnosis...
Страница 287: ......
Страница 289: ...1 2...
Страница 297: ...2 1 Protection Through Security Mode Settings 2 8...
Страница 395: ...3 17 File Initialize 3 98...
Страница 417: ...4 2 Addition of Base and Station Axis 4 22...
Страница 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Страница 436: ...Hardware...
Страница 437: ......
Страница 447: ...6 4 Equipment Configuration 6 10...
Страница 456: ...8 8 Open Phase Check 8 8...
Страница 476: ...9 4 Recommended Spare Parts 9 20...
Страница 477: ...Alarm Error...
Страница 478: ......
Страница 523: ......
Страница 524: ......
Страница 525: ......
Страница 526: ......
Страница 527: ......
Страница 528: ......
Страница 529: ......
Страница 530: ......
Страница 531: ......
Страница 532: ......
Страница 533: ......
Страница 534: ......
Страница 535: ......
Страница 536: ......
Страница 537: ......
Страница 538: ......
Страница 539: ......
Страница 540: ......
Страница 541: ......
Страница 542: ......
Страница 543: ......
Страница 544: ......
Страница 545: ......
Страница 546: ......
Страница 547: ......
Страница 548: ......
Страница 549: ......
Страница 550: ......
Страница 551: ......
Страница 552: ......
Страница 553: ......