4.1 Notes on Cable Junctions
4-2
4.1
Notes on Cable Junctions
• The cables that connect the controller to peripheral equipment are low voltage circuits.
Keep controller signal cables away from the primary power circuit. High voltage power
lines should not be run in parallel to controller signal cables. If running parallel cables is
unavoidable, use metal ducts or conduit to isolate electrical signal interference. If cables
must be crossed, run the power cables perpendicular across the signal cables.
• Confirm the connector and cable numbers to prevent misconnection and equipment dam-
age. One connects the manipulator and XRC. Another connects the XRC and peripheral
equipment. A wrong connection can cause damage to electronic equipment.
• Clear the area of all unauthorized personnel while making cable connections. Place all
cables in a covered cable channel in the floor.
• Wiring must be performed only by authorized personnel.
Incorrect wiring may cause fire and electric shock.
• Perform wiring in accordance with the rated capacity as specified in
the Instructions.
Incorrect wiring may cause fire or mechanical breakdown.
• Be sure the power circuit screws are securely tightened.
Loose power circuit wires can cause fire and electric shock.
• Do not handle the circuit board directly by hand.
The IC board may malfunction due to static electricity.
Содержание SK300X
Страница 2: ......
Страница 4: ...SK300X Manipulator Manual XRC 2001 ii MOTOMAN NOTES...
Страница 7: ...INTRODUCTION MOTOMAN 1 3 SK300X Manipulator Manual XRC 2001 NOTES...
Страница 21: ...viii...
Страница 25: ...xii...
Страница 41: ...1 7 Notes on MOTOMAN Disposal 1 16...
Страница 59: ...4 3 Connection Methods 4 12...
Страница 67: ...6 1 Movement of the Axes 6 4...
Страница 73: ...8 2...
Страница 74: ......
Страница 93: ...3 3 Location 3 6...
Страница 99: ...4 2 Cable Connection 4 6...
Страница 102: ...5 4 Dimensions and Working Range 5 3 5 4 Dimensions and Working Range Fig 10 a Dimesions and Working Range YR SK300 J0...
Страница 103: ...5 4 Dimensions and Working Range 5 4 Fig 10 b Dimesions and Working Range YR SK300 J1...
Страница 104: ...5 4 Dimensions and Working Range 5 5 Fig 10 c Dimesions and Working Range YR SK300 J2...
Страница 109: ...6 2 Wrist Flange 6 4...
Страница 133: ...9 2 Notes on Maintenance Procedures 9 18...
Страница 136: ...11 1 S Axis Driving Unit 11 1 11 Parts List 11 1 S Axis Driving Unit...
Страница 138: ...11 2 L U Axis Driving Unit 1 11 3 11 2 L U Axis Driving Unit 1...
Страница 140: ...11 3 L U Axis Driving Unit 2 11 5 11 3 L U Axis Driving Unit 2...
Страница 234: ...2 8 General I O Signal Assignment 2 72...
Страница 270: ...4 4 Recommended Spare Parts 4 30...
Страница 285: ...xiv...
Страница 286: ...Setup Diagnosis...
Страница 287: ......
Страница 289: ...1 2...
Страница 297: ...2 1 Protection Through Security Mode Settings 2 8...
Страница 395: ...3 17 File Initialize 3 98...
Страница 417: ...4 2 Addition of Base and Station Axis 4 22...
Страница 435: ...5 6 Position Data When Power is Turned ON OFF 5 18...
Страница 436: ...Hardware...
Страница 437: ......
Страница 447: ...6 4 Equipment Configuration 6 10...
Страница 456: ...8 8 Open Phase Check 8 8...
Страница 476: ...9 4 Recommended Spare Parts 9 20...
Страница 477: ...Alarm Error...
Страница 478: ......
Страница 523: ......
Страница 524: ......
Страница 525: ......
Страница 526: ......
Страница 527: ......
Страница 528: ......
Страница 529: ......
Страница 530: ......
Страница 531: ......
Страница 532: ......
Страница 533: ......
Страница 534: ......
Страница 535: ......
Страница 536: ......
Страница 537: ......
Страница 538: ......
Страница 539: ......
Страница 540: ......
Страница 541: ......
Страница 542: ......
Страница 543: ......
Страница 544: ......
Страница 545: ......
Страница 546: ......
Страница 547: ......
Страница 548: ......
Страница 549: ......
Страница 550: ......
Страница 551: ......
Страница 552: ......
Страница 553: ......