
Rev. 1
Page 2-
23
Levelling
At the end of the ventilation phase, the chamber is brought back to atmospheric pressure (
LEVELLING
) by injecting sterile outside air to allow the
opening of the door and the retrieval of the load:
1
1 3 4 ° C P O R O U S
L E V E L L I N G
8 6 . 9 ° C
- 0 . 4 3 b a r 2 9 : 2 1
CHAMBER
Water
tank
DESCRIPTION
STATUSES
(P, t)
VP WP
EV1
(no)
EV2
(nc)
EV3
(nc)
EV4
EV5
(no)
EV6
(nc)
Fan
Levelling
(pressure)
from -0,45 to –0,10 bar
(-0,10 bar to the value of 0 bar in the
memory)
OFF OFF ON OFF OFF OFF OFF OFF OFF
Levelling
(waiting time for the
release of the locking
door mechanism)
Waiting time = 15”
(counting start from pressure–0,10 bar)
OFF OFF ON OFF OFF OFF OFF OFF OFF
Содержание millennium B
Страница 1: ...Rev 1...
Страница 202: ...Rev 1 Gr2 INDEX GROUP 2 ELECTROVALVES EV1 VALVE 1 EV2 VALVE 2 EV3 VALVE 3 EV4 VALVE 4 EV5 VALVE 5...
Страница 208: ...Rev 1 Gr3 INDEX GROUP 3 PUMPS STEAM GENERATOR WATER PUMP 1 AUTOMATIC WATER FILLING PUMP 2 VACUUM DOUBLE PUMP 3...
Страница 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Страница 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Страница 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Страница 272: ...Rev 1 Page 4 6 TABLE 2...
Страница 273: ...Rev 1 Page 4 7 TABLE 3...
Страница 274: ...Rev 1 Page 4 8 TABLE 4...
Страница 275: ...Rev 1 Page 4 9 TABLE 5...
Страница 276: ...Rev 1 Page 4 10 TABLE 6...