
Rev. 1
Page 2-
22
Ventilation
When the drying phase is finished, it is followed by a
VENTILATION
phase in which fresh sterile air is injected, while maintaining a vacuum in the
chamber, to eliminate condensate and cool the load:
1
1 3 4 ° C P O R O U S
V E N T I L A T I O N
8 4 . 4 ° C
- 0 . 7 7 b a r 2 6 : 5 1
Water
tank
DESCRIPTION
STATUSES
(P, t)
VP WP
EV1
(no)
EV2
(nc)
EV3
(nc)
EV4
EV5
(no)
EV6
(nc)
Fan
Ventilation
from -0,50/0,80 to -0,45 bar
ON
OFF
OFF
OFF
ON
ON
OFF
OFF
ON
Содержание millennium B
Страница 1: ...Rev 1...
Страница 202: ...Rev 1 Gr2 INDEX GROUP 2 ELECTROVALVES EV1 VALVE 1 EV2 VALVE 2 EV3 VALVE 3 EV4 VALVE 4 EV5 VALVE 5...
Страница 208: ...Rev 1 Gr3 INDEX GROUP 3 PUMPS STEAM GENERATOR WATER PUMP 1 AUTOMATIC WATER FILLING PUMP 2 VACUUM DOUBLE PUMP 3...
Страница 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Страница 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Страница 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Страница 272: ...Rev 1 Page 4 6 TABLE 2...
Страница 273: ...Rev 1 Page 4 7 TABLE 3...
Страница 274: ...Rev 1 Page 4 8 TABLE 4...
Страница 275: ...Rev 1 Page 4 9 TABLE 5...
Страница 276: ...Rev 1 Page 4 10 TABLE 6...