
Rev. 1
Card Gr3-
1
STEAM GENERATOR WATER PUMP ASSEMBLY
A#0BP2860000
STEAM GENERATOR WATER PUMP
400#00220000
WATER PUMP VALVE (EV6)
401#00030000
Before servicing, switch off the equipment and unplug the power
supply cable from the mains socket
1.
Remove the covers (see card
Gr7-1
);
2.
Empty the main reservoir by removing the bottom plug;
3.
Remove the transparent and sheathed pipes (1 and 2);
4.
Remove the wiring from the pump;
5.
Remove the clamps (3) fixing the water pump to the wire-bracket (4) and
remove the pump;
6.
Maintain steady the pump shaft, unscrew the valve (5);
7.
Mount the new pump, restore connections and assembly all items proceeding
in reverse order as above;
8.
Run a sterilization cycle.
1
2
3
4
5
Содержание millennium B
Страница 1: ...Rev 1...
Страница 202: ...Rev 1 Gr2 INDEX GROUP 2 ELECTROVALVES EV1 VALVE 1 EV2 VALVE 2 EV3 VALVE 3 EV4 VALVE 4 EV5 VALVE 5...
Страница 208: ...Rev 1 Gr3 INDEX GROUP 3 PUMPS STEAM GENERATOR WATER PUMP 1 AUTOMATIC WATER FILLING PUMP 2 VACUUM DOUBLE PUMP 3...
Страница 243: ...Rev 1 Gr7 INDEX GROUP 7 COVERS FRAME COVER 1 DOOR COVER 2 FRONT FRAME 3 SERVICE DOOR 4...
Страница 270: ...Rev 1 Page 4 4 HYDRAULIC DIAGRAM CHAMBER HEAT EXCHANGER WP VP Main tank...
Страница 271: ...Rev 1 Page 4 5 EXPLODED VIEWS TABLE 1...
Страница 272: ...Rev 1 Page 4 6 TABLE 2...
Страница 273: ...Rev 1 Page 4 7 TABLE 3...
Страница 274: ...Rev 1 Page 4 8 TABLE 4...
Страница 275: ...Rev 1 Page 4 9 TABLE 5...
Страница 276: ...Rev 1 Page 4 10 TABLE 6...