A. Before change.
B. After change.
* Make sure that the wirings are bounded with the wire clips in order to prevent the electrical box from entering water.
Marking of the position of the suspension bolts and wiring connections
1
Mark the positions of the suspension bolts, refrigerant piping connections and wiring connection.
2
Installation dimensions are shown in
, see on page 23
Mounting the CH unit
1. How to put nuts.
Put nuts on each of the two suspension bolts before hanging the CH unit, as shown in next figure.
* Mounting washers are required in order to fix the suspension bracket to the suspension bolt.
1
Suspension Bolt (M10 or W3/8) (Field-Supplied)
2
Nut (Field-Supplied)
3
* Washer (Field-Supplied)
4
Suspension Bracket (Equipped with CH Unit)
5
* Washer (Field-Supplied)
6
Double nut (Field-Supplied)
Field-Supplied Parts
* Suspension Bolt: 2-M10 or W3/8
* Nut: 6-M10 or W3/8
* Washer: 4-M10 or W3/8
2. Hanging the CH unit.
•
To hang the CH unit hold it from the bottom of the casing.
•
Insert the suspension bolt into the groove part of the suspension bracket as shown in the figure below. Ensure that the
washers are correctly fixed to the suspension bracket.
•
After hanging the unit, the piping and wiring connection should be done inside the ceiling. The position of the pipes has
to be taken into account when selecting the location of the CH unit installation.If the CH unit has to be installed in a
location where there is no piping or wiring connection, piping and wiring installation should be done before the unit is
hanged.
•
Keep the CH unit levelled to the ceiling. If the CH unit is not leveled, a malfunction may occur.
•
Once the position of the CH unit is adjusted, tighten the nuts of the suspension bolts.
1
Suspension Bracket.
2
Upper side.
3
Suspension bolt.
4
Bottom side.
1
4
2
30-50mm
CH UNIT
* 3
* 5
6
2
3
1
4
2 Unit installation
28
SMGB0065 rev. 1 - 12/2010