¿
Piping insulation
CH-6.0N1
1
(ID38)
1
(ID16)
1
(ID16)
1
(ID38)
1
(ID38)
2
2
CH Unit
3
CH-10.0N1
1
(ID43)
1
(ID22)
1
(ID43)
1
(ID22)
1
(ID20)
1
(ID43)
2
2
CH Unit
3
1
Insulation.
2
Clamp.
3
(Upper surface).
ID: Inner diameter.
N O T E
•
In case that the humidity inside the ceiling is high, apply additional insulation to the flare nut connection.
•
Refer to the chapter initial check
, see on page 23 for more details.
3 Piping work and
refrigerant charge
70
SMGB0065 rev. 1 - 12/2010