Page B-52
Airframe Specific Installation Instructions (G900X Only) – G900X/G950 Installation and Maintenance Manual
Revision D
190-00719-00
4.
Fill gap between sides of fuselage and shelf with epoxy/flox mixture. Be sure to make a radius at
the corners as demonstrated in Figure B-66 to smooth the corners for laying glass in the following
steps. When aligning the shelf, ensure the shelf remains level to within 3° of the pitch and roll
axes.
FILL WITH
EPOXY/FLOX
MIXTURE
Figure B-66. Fill Detail For Corner Radii And Magnetometer Shelf
5.
Secure the shelf to the fuselage with one layer of 3.0 in. wide, 2 bid strips at each corner above
and below the shelf. The lay up is shown in Figure B-67.
MAGNETOMETER SHELF
3" WIDE, 2 BID STRIPS, 4 PLACES
UP
FWD
Figure B-67. Magnetometer Shelf With Lay up